Improve The Efficiency Of Log Splitter

  • Log Splitter clogging is one of the common failures in the use of the shredder. There may be problems in the design of the equipment, but it is more caused by improper use and operation.

    (1) The feeding speed is too fast and the load increases, causing blockage. During the feeding process, you should always pay attention to the large deflection angle of the ammeter pointer. If it exceeds the rated current, it indicates that the motor is overloaded, and the motor will be burned if overloaded for a long time. When this happens, you should immediately reduce or close the material door, or you can change the way of feeding, and control the amount of feed by increasing the feeder. There are two types of feeders: manual and automatic. The user should choose the appropriate feeder according to the actual situation. Due to the high speed of the crusher, the large load, and the strong fluctuation of the load. Therefore, the current of the shredder is generally controlled at about 85% of the rated current.

    (2) The discharging pipeline is not smooth or blocked and the feed is too fast, which will block the tuyere of the grinder; improper matching with the conveying equipment will cause the discharge pipeline to be blocked when the wind is weakened or there is no wind. After the fault is detected, the unmatched conveying equipment should be cleared first, and the feeding amount should be adjusted to make the equipment operate normally.

    (3) Hammer fragments, aging, closed or broken screen holes, and high water content of the crushed materials will block the crusher. The broken and severely aged hammers should be updated regularly, the crusher should be kept in good working condition, and the screen should be checked regularly. The moisture content of the crushed material should be less than 14%, which can improve the production efficiency and prevent the Performance Built Log Splitter. Blocking, enhancing the reliability of the crusher