Introduction To The Launch Of Performance Built Log Splitter

  • After Log Splitter, is installed, it should be checked before starting. This is the first and important step of preparing for its operation. Let’s take a look!

    1. Check whether the fly knife and the bottom knife are tight according to the specified tightening torque.
    2. The gap between the flying knife and the bottom knife of the integrated crusher should be within the range of 0.5-1mm (check with thickness inspection).
    3. There should be no metal debris in the machine.
    4. Rotate the pulley of the comprehensive crusher by hand for more than one week without collision.
    5. The tension of the V-belt is moderate, and the belt cover should be installed.
    6. The electrical system is in a normal state.
    7. The joints of the hydraulic system are well sealed and there is no oil leakage.
    8. The direction of rotation of the knife roller and the feeding roller is correct.

    In addition, the dry run of the Performance Built Log Splitter is 1-4 hours. After the dry run is normal, load cutting can be carried out.