Points To Note When Installing Three Phase Electricity Meters

  • When we use electricity, we cannot do without the electric energy meter. Many people choose to install a three phase electricity meter to calculate the electric energy usage. So what should we pay attention to during the installation process?

    The meter has been inspected and sealed before leaving the factory, and can be installed and used. If it is lead-free or stored for too long, please ask the relevant department to re-check and seal it before installation.

    The meter should be installed vertically and not inclined in a dry and ventilated place. The bottom plate of the meter should be fixed on a solid, fire-resistant and non-vibration wall. The height of the meter should be about 1.8m.

    Connect the wires according to the wiring diagram, tighten the connection screws, and tighten the connecting plate in the lower end twist box.

    The above are some of the points that need to be paid attention to during or before installation of a three-phase meter. In addition to three-phase meters, other meters such as kilo watt-hour meter can also be viewed in accordance with these points.